This training manual is intended for use as a training guide and reference text for engineer personnel responsible for planning, scheduling, and controlling construction projects. It provides planning and management techniques to be applied when planning and scheduling a construction project. This manual also provides techniques and procedures for estimating material, equipment, personnel, and time requirements for project completion. the table of content is as follows: Chapter 1: Mission of Army Engineer Project Management, Management Theory, Military Construction Management, Execution Chapter 2: Planning and Scheduling Processes, System Management, Gantt Chart Method, Critical Path Method Chapter 3: Activity Estimates, Importance of Detailed Estimates, The Estimating Process, Work-Sheet Estimates, Optimum Lumber Length Calculations Chapter 4: Efficient Site Layout, Principles, Methods Chapter 5: Controlling Functions, Supervision, Inspections and Reports, Supervision of Indigenous Personnel, Quality Control Chapter 6: Earth-Moving Operations, Equipment, Site preparation, Excavation and Backfill, Dredging Operations, Base and SUbbase Preparation, Graphic Aids, Estimating Tables Chapter 7: Paving Operations, Types, Equipment, Asphalt, Concrete, Curbs and Walks, Estimating Tables, Examples of Table Use Chapter 8: Concrete Construction, Types, Labor of Forming, Labor of Reinforced Concrete, Labor of Mixing Concrete, Labor of Placing COncrete, Labor for Finishing Concrete, Labor for CUrsing Concrete, Fine-Grading Process, Vapor-Barrier Placement, Expansion Joints, Cold-Weather Protection, Estimating Tables Chapter 9: Carpentry, Types, Rough Carpentry, Florring, Finish Carpentry, Windows and Doors, Insulation, Estimating Tables, Example of Table Use Chapter 10: Masonry, Types, Brick and COncrete Block, Mortar-Bound Rubble, Ceramic and Quarry Tile, Structural Tile, Lath and Plaster, Estimating Tables, Example of Table Use Chapter 11: Roofing, Types, Estimating Tables, Example of Table Use Chapter 12: Electrical Work, Types, Electrical Line Work, Outdoor Lighting, Underground Power System, Interior Electrical Rough in, Interior Electrical Finish and Trim, Transofrmers and Substation Equipment, Estimating Tables, Example of Table use Chapter 13: Plumbing, Types, Pipe, Valves and Fittings, Fire Hydrants, Post indicator Valves, and Thrust Blocks, Rough in Plumbing, Finish Lumbbing, Estimating Tables, Example of Table Use Chapter 14: Equipment Installation, Types, Unloading, Cleaning and Assembling, Positioning and Aligning, Supporting and Anchoring, Connecting Equipment, Estimating Tables Chapter 15: Metal Work, Types, Eretion of Structural and MIscellaneous Steel, Sheet metal, Installation of Fencing, Estimating Tables Chapter 16: Waterfront Construction, Types, Equipment Selection, Pile-Driving Work, Pile-Bracing Installation, Pile-Capping Work, Sheet-Piling Installation, Pier-Framing INstallation, Deck Hardware installation, Pile extraction, Estimating Tables, Example of Tabl use Chapter 17: Other estimating Requirements, Wrecking and Salvage, Removing Snow Appendix A: Work-element Checklist, Building, Outside Utilities, Plant Operations, Roads, Paving and Walks, Waterfront Construction Appecdix B: Resource Constraining, Procedures, Sample Problem, Use of COmputers Appendix C: Conversion Factors Appendix D: Typpical Plant Layouts Appendix E: Equipment and TOol Checklist, Concrete Work, Masonry, Reinforcing Bars, Plaster, Paint Appendix F: Consumption Factors for Expendable Supplies (please look at our rules and privacy policy) |
krista-ayers@machine--tools.com (Krista Ayers)
for additional information. This email is used for forwarding to newsgroup user.